WASTE TREATMENT INSTALLATIONS

Vehicle and people traffic inside solid waste working plants is subject to special safety regulations. These include separation of various rooms in large buildings having wide entries in prefab walls where doors must be installed .

vertical rollup doors have been successfully installed in many applications, including large entries with widths up to 20 meters, a height of 8 meters, meeting a high wind force pressure and no transit problems.

A sophisticated control for door opening and closing allows its interface with the plant PLC logic.

Some Waste recycling installations:

Regione Lombardia

  • Impianto di Molteno (Lecco)
  • Impianto di Parona (Pavia)
  • Impianto Eco Pol (Brescia)
  • Impianto Bas Power (Bergamo)

Regione Veneto

  • Impianto di Bassano del Grappa (Vicenza)
  • Impianto di Fusina (Venezia)

Regione Lazio

  • Impianti di S.Vittore del Lazio, Colleferro e Terni
  • Comune di Roma : Impianti di Rocca Cengia e via Salaria

Regione Campania

  • Impianti di Giugliano, Caivano, (Napoli)
  • Impianto di S.Maria Capuavetere (Caserta)
  • Impianto di Pianodardine (Avellino)
  • Impianti di Crotone e Potenza
  • Impianto di Lamezia Terme

Regione Sardegna

  • Impianto di Cagliari Casic 
Shares
Share This